-
MR Gurami Gureshidzecandy my good friend, honest supplier.
-
MR MIKOYOU ARE GOOD NOW AND YOUR BUSINESS STABLE CANDY.
4200kg Construction Mesh Welding Machine , Fence Mesh Welding Machine
Contact me for free samples and coupons.
WhatsApp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xMaterial | Steel Welding | Control | PLC Control And English Lanaguge |
---|---|---|---|
Line Wire Feeding | Pre-cut | Cross Wire Feeding | Pre-cut And Falling Auto |
Product Name | Fence Mesh Welding Machine | Material Feed | Low Carbon Steel, Balck Wire, Galvanized Wire |
High Light | 4200kg Construction Mesh Welding Machine,Z2000 Fence Mesh Welding Machine,4200kg Fence Mesh Welding Machine |
fully automatic guard fence mesh welding machine line high quality
Model | DZ-250B |
Wire diameter | 2.5-6mm |
Longitude wire space | 50-300mm |
Cross wire space | Min.25mm/12.7mm |
Mesh width/height | Max.2.5m |
Mesh length | Max.6m |
Welding electrodes | 48pcs |
Welding speed | 50-75 times/min |
Welding transformers | 125kva*6pcs |
Need air compressor | 0.3m^3 |
Need power supply | Min.160kva |
Overall Size | 5.4*3.2*1.7m |
Weight |
4200kg |
1. Feeding material:
The warp wire and weft wire are straightened and cutted from coil wire material ,realized by auto straightening and cutting machine.
The warp wire are placed on a corresponding wire penetrating mold by worker, and the weft wire will be automatic falling down one by one ,from the weft wire system
2. Welding mesh panel system:
The main machine starts welding and adopts a synchronous control technology, both branch control welding time and welding time are controlled by a Mitsubishi PLC digital programming system, and the mesh opening size can be adjusted only by direct input on a touch screen; and it could be exist different weft distance on one piece of one mesh sheet
3. Drawing mesh panel system:
Panasonic ( Japan ) step motor controls the whole automatic mesh panel drawing process until one mesh panel finished, and the automatic mesh connecting and discharging system is started; the welding of the next mesh is started.
After-sale service
1. If the buyers need, we can send our technical staff to the buyers factory to install the machine and providing the training in 30 days after the machines arrived the destination port
2. Maintenance period :one year for whole machine except vulnerable parts
3. The numbers of technical persons:one technical per machine
4. The fees: the buyer have to pay the technical salary 80 USD per day, and the round-trip ticket, accommodation and other related fees.
During the maintenance period , if the parts are broken caused by the product problem, seller will offer the parts for free, if you need we assign the technicians to your factory, then you will pay some related fees.