-
MR Gurami Gureshidzecandy my good friend, honest supplier.
-
MR MIKOYOU ARE GOOD NOW AND YOUR BUSINESS STABLE CANDY.
Pneumatic Reinforced Rebar Mesh Welding Machine , Steel Bar Mesh Welding Machine

Contact me for free samples and coupons.
WhatsApp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xMaterial | Steel Welding | Control | PLC Automatic Prenmatic |
---|---|---|---|
Line Wire | Pre-cut By Machine | Cross Wire Feeding | Pre-cut |
Engineer | Available To Service Machinery Overseas | Product Name | Reinforcing Mesh Welding Machine |
Highlight | 9.5T Rebar Mesh Welding Machine,50times/min Rebar Mesh Welding Machine,50times/min Steel Bar Mesh Welding Machine |
Pneumatic Reinforced Rebar Mesh Welding Machine
machine details:
Technical items | Parameters | Parameters | |
Wire diameter | 5-12mm | 5-12mm | |
Cross wire space | 100--300mm | 100-300mm | |
Line wire space | 50--200mm | 50-200mm | |
Number of electrodes | 24 | 30 | |
Max. mesh width | 2500mm | 3000mm | |
Mesh length | 3000 -12000mm | 3000-12000mm | |
Rated power | 120kvax12 | 120kvax15 | |
Welding speed | 30-50 times/min | 30-50 times/min | |
Weight | 7.5t | 9.5t | |
Overall dimension | 24x6.0x2.65m | 24x6.5x2.65m | |
Cross wire form | pre-cut wire | pre-cut wire | |
Line wire form | pre-cut wire | pre-cut wire | |
Welding transformer | with water cooling system | with water cooling system | |
Mesh pulling way | Controlled by PLC | Controlled by PLC | |
Cross wire feeding way | Automatic falling ,one by one | automatic falling,one by one | |
Material | low carbon steel wire, galvanized wire or ribbed wire | Low carbon steel wire, galvanized wire or ribbed wire |
machine advantage
Panasonic, Schneider, ABB, SMC, Igus electric components.
Touch screen interface.
Pre-straightened & pre-cut wires.
PLC control of cross wire space adjustment and welding current adjustment.
Panasonic servo motor for mesh pulling.
Pure welding electrodes, 30*30*30mm (3-8mm), 30*30*50mm (5-12mm).
Cooling system: cast water-cooling transformer and lower welding electrode base.
Brake motor & reducer connect the principal axis directly.
Wire pre-load system.
After-sale service
1. If the buyers need, we can send our technical staff to the buyers factory to install the machine and providing the training in 30 days after the machines arrived the destination port
2. Maintenance period :3 year for whole machine except vulnerable parts
3. The numbers of technical persons:one technical per machine
4. The fees: the buyer have to pay the technical salary 100 USD per day, and the round-trip ticket, accommodation and other related fees.
During the maintenance period , if the parts are broken caused by the product problem, seller will offer the parts for free, if you need we assign the technicians to your factory, then you will pay some related fees.
5.transportation
If you have special requirements about the package of the machine, please specify it when placing the order.
In the process of the transportation, please pay attention to the following items:
- Prevent the machine from strong bumping or dropping. Otherwise, some parts on the machine may be damaged, especially the precise instrument, meter, electric control device or other precise mechanical parts.
- Please keep the machine waterproof, rain-resistant, antidamp
- The machine should be placed in even and stable and fixed in the container well in case of the movement or misplacement
- Storage
This product shouldn’t be put in the open air and should be put in the room that is dry and free of blast and erosive gas, and no strong concussion. The reserve period shouldn’t exceed half a year.